Everything is updated I used:

OWE = 3160 kg
MTOW = 4613 kg
Blocktime = 3.083
Mission Block Fuel Weight = 563 kg

Let me know if these values change!!!

Manufacturer study Price (MSP)
$3,900,000
Airframe Spaces
$279,221
Engine Spares
$332,337
Total Investment TI
$4,511,558
Depreciation (DEP) $/sector
$307.90
Interest (INT) $/sector
$215.53
Insurance (INS) $/sector
$22.36
Cockpit Crew cost per sector (CPC) $/sector
$1,172
Landing fees (LAF) $/sector
$27.68
Navigation Charges  (NAV) $/sector
$337.52
Fuel Cost (FC)   $ /gal
$518.3
Airframe maintenance Costs (AFM)  $/sector
$562.75
Labour Airframe Cost  $/sector
$533.62
Airframe Materials                  $/sector
$29.13
Engine Maintenance Cost (EMC)  $/ sector
524.9
Maintenance LABOUR
99.4
Maintenance Material    $/sector
226.6
Engine Maintenance Cost
198.9
AIRCRAFT TRIP COST   cents/nm
$34.15